Laying oil, gas and water lines is a core activity and primary expertise of Kobi Zion Ltd.
The extensive expertise and knowhow we have accumulated in the area, combined with the advanced dedicated equipment readily available to us, are the key to our capability to provide a complete solution for any project, including earthworks, welding, pumping groundwater, screening and backfill.
As early as the planning stage we accompany our clients as partners, providing engineering consultation and the best solutions, even in the most difficult and complex terrain conditions. At a later stage, with the deployment in the area, thanks to the extensive experience and technological superiority we have acquired, we are ready to respond rapidly and effectively to any logistical and technical requirement that may emerge.
In order to provide high-quality pipelines that have successfully passed the inspections the first time and which shall remain in good condition and serviceable for many years to come, we are committed to implementing professional work, while using high quality materials and strictly complying with the most stringent safety and quality standards.
The service includes: Studying the route, preparing a right of way, pipe stringing, bending pipes, welding (automatic and manual), field joint coating, lowering in backfill, Wadi crossing and horizontal drilling and finally – executing hydrostatic testing and pipe draying, conducting drainage tests for the pipelines and then handing over to the client.
Over the years we have managed and impemented, as contractors and subcontractors of local and international companies, complex projects of laying cross county pipelines, including high-pressure main lines.
Among our clients / projects we have executed:
Eilat Ashkelon Pipeline Company Ltd-EAPC.
2015 – Laying a 16” fuel line for 2 km at Maale Zin.
2014 – Laying a 16” fuel line for 3 km on the Nahal Atadim bypass line.
2012 – Laying a 42” fuel line for 4.5 km of Ashkelon.
2012 – Laying of fire extinguishment systems and water lines for 3 km of Ashkelon.
Israel Natural Gas Line Company Ltd – INGL in Partnership with Lesico Ltd.
Laying a 12” gas line for 5 km from the Reduction Station of Rotem Power Station OPC.
Sicim Spa Company / Israel Natural Gas Line Company Ltd-INGL.
2016 – Laying an 18” gas line for 14 km at Ashdod Palmachim.
2015 – Laying a 30” gas line for 12 km at Kfar Aviv, Ashdod.
2015 – Laying a 30” gas line for 14 km at Sorek Kfar Aviv.
2013 – 2014 – Laying an 18” gas line for 17 km at Yesodot Mesillat Zion.
Chemo Aharon Company Ltd / Israel Natural Gas Line Company Ltd-INGL.
2016 – Excavation works to lay a 36” natural gas line for 12 km, Eastern project.
2010 – Excavation works to lay a triple 18/24/30” natural gas line for 12 km, Tel Kashish.
Lesico Ltd /Israel Natural Gas Line Company Ltd-INGL.
2009 – Laying 18” gas lines for12 km at Mishor Rotem and construction of a PRMS station.
GHIZZONI SPA / Israel Natural Gas Line Company Ltd-INGL.
2006 – Laying 24” gas line for 93 km Ashdod Nesher, Southern Kiryat Gat, Ashkelon.
2007 – 2008 – Laying a 24” gas line for 133 km Kiryat Gat Southern Dead Sea.
2009 – Laying an 18″ gas line for 32 km Kfar Yehoshua Alon Tavor.